Whitehorse General Hospital Laboratory Infrastructure Readiness & Upgrade Design

A multidisciplinary assessment and coordinated design program to prepare an active hospital laboratory for new diagnostic equipment while protecting essential clinical operations.

CLIENT
Yukon Hospital Corporation
PROVINCE
Whitehorse, Yukon
TIMELINE
October 2025 - Ongoing
QUICK DETAILS
Contract Type
Assessment & Design
Primary Goal
Equipment Readiness
Design Output
Drawings & Specifications

Project Overview

Yukon Hospital Corporation engaged Avodahtec to assess and develop the infrastructure upgrades required to support the modernization of laboratory services at Whitehorse General Hospital.

The project involved reviewing the existing laboratory space and its supporting building systems to determine readiness for new diagnostic equipment. The assessment covered structural, mechanical, electrical, plumbing, controls, and IT considerations.

The objective was to identify required facility modifications and develop coordinated engineering recommendations that support safe equipment installation while maintaining ongoing laboratory operations.

Project Scope Snapshot

Facility

Active Lab

Hospital laboratory operating throughout assessment and planning

Project Focus

Readiness

Infrastructure preparation for new diagnostic equipment

Disciplines

7 Systems

Structural, electrical, mechanical, HVAC, plumbing, controls & IT

Deliverables

Design

Technical assessment, coordinated drawings, specifications & implementation recommendations

The Challenge

Installing new diagnostic equipment within an active hospital laboratory requires careful coordination across multiple disciplines while protecting staff, patients, and essential clinical services.

Infrastructure Challenge

Confirming whether the existing laboratory could accommodate the proposed equipment and identifying required structural, electrical, mechanical, plumbing, controls, and IT upgrades.

 

Operational Challenge

Developing a coordinated, practical design that meets equipment and hospital operating requirements, minimizes disruption, and supports future tendering and construction.

Our Approach

Avodahtec delivered a structured, multidisciplinary assessment and design program:

1. Desktop Review

Reviewed available facility drawings, equipment information, operational requirements, and existing infrastructure records to establish baseline conditions and identify information gaps.

2. Site Assessment

Conducted an on-site assessment of the laboratory and supporting service areas to document existing conditions, available access, and infrastructure constraints.

3. Multidisciplinary Infrastructure Assessment

Evaluated structural capacity, electrical services, HVAC, plumbing, controls, and IT infrastructure to determine the facility’s readiness for the proposed equipment.

4. Requirements & Gap Analysis

Compared existing conditions with equipment requirements, applicable standards, and hospital operational needs to identify necessary modifications and areas requiring further coordination.

5. Coordinated Design Development

Developed coordinated engineering drawings, technical specifications, and recommendations for the required facility and utility upgrades.

6. Implementation Planning

Incorporated construction sequencing, infection control, environmental protection, and continuity-of-operations considerations. The resulting documentation supports future tendering, construction planning, and equipment installation.

What Made This Project Successful

One Coordinated Multidisciplinary Review

Structural, electrical, mechanical, HVAC, plumbing, controls, and IT requirements were evaluated together to expose system interdependencies early.

Designed Around Clinical Continuity

Recommendations account for construction sequencing, infection control, environmental protection, and the need to maintain ongoing laboratory operations.

Equipment Requirements Connected to Facility Systems

The gap analysis directly compares proposed diagnostic-equipment needs with existing building capacity, applicable standards, and hospital operating requirements.

Practical, Tender-Supporting Deliverables

Coordinated drawings, technical specifications, and implementation recommendations provide a clear foundation for future tendering, construction, and equipment installation.

Active-Facility Insight

The on-site assessment captured real access conditions, service-area constraints, and operational factors that could not be resolved through records review alone.

PROJECT DETAILS
Type
Public Municipality
Location
Yukon
Start
October 2025
Status
Ongoing